Two Changes With the Same Number

Educational overview only. Prudent Guardian (www.inspirecodingedu.com) is not an insurance company, broker, law firm, or registered investment adviser, and does not provide personalized insurance, investment, tax, medical, or legal advice. Verify details with licensed professionals and official issuers.

Two orders share a number. The log has only one row. You’re staring at the printout propped against your keyboard, a half-empty coffee mug sweating on the corner of the desk next to it, and the two change order slips in your hand both have the number CO-147 scrawled across the top right. You’d marked both as approved last week after separate walkthroughs with the concrete and framing foremen, and you didn’t catch the duplicate numbering until you started cross-referencing submitted costs for this month’s draw.

Match each change order line item to the logged scope of work

You pull up the digital copy of your current construction pay document on your second monitor, navigating to the change order tab that has the single CO-147 entry logged last month. You flip back and forth between the two physical slips, first reading the scope for the first CO-147: patching 12 linear feet of foundation crack at the south loading dock, injected with epoxy and sealed to meet local waterproofing standards. The logged entry only lists that scope, so you set that slip to the left side of your desk. The second slip with the same number covers framing a 4×8 foot storage closet in the ground-floor utility room, including fire-rated drywall and a pre-hung solid core door, work that was requested after the initial walkthrough for the foundation patch. You note that the framing work was never added to the pay document’s change order log, which is why only one row appears for the shared number. You cross-check the date of the logged entry against the date you signed off on each slip, confirming that the foundation patch was approved three days before the framing work, which explains why it was the only one added to the log initially—you’d filed the framing slip in your pending work folder instead of the approved change order folder by accident after the second walkthrough.

Two Changes With the Same Number
The jacket stays closed on the table.

Note dollar value discrepancies between the two matching-number orders

You tally the costs for each slip separately, making sure to separate labor, materials, and markup for each scope so you don’t accidentally combine values when you update the log. Illustrative example: the foundation patch work totals $1,820, while the storage closet framing totals $2,470, so the combined value of the two CO-147 slips is $4,290, a number 135% higher than the single $1,820 entry currently logged in your pay document. You cross out the handwritten CO-147 on the framing slip, write CO-147A in red ink next to it, and initial the change so there’s no confusion when you pass the slips along to the project coordinator for their records. You also add a sticky note to the front of the slip packet explaining the duplicate numbering error, so anyone reviewing the physical copies later understands why two slips have matching original numbers. You make sure to note that both slips have signed approval from the project’s field superintendent, so there’s no question that both scopes are authorized and eligible for inclusion in an upcoming draw, once the work is fully completed and inspected. You can log the adjusted numbering and supporting scope notes directly in Draw Jacket if you use the platform to centralize change order records for your project teams.

Add a duplicate entry flag to your active pay document tracker

You don’t want to delete the original logged entry, because the foundation patch work was already referenced in last month’s preliminary draw submission, so adding a new row for the second slip keeps all existing records intact while accounting for the missing scope. The numbered steps below walk you through updating the log accurately without disrupting existing tied costs:

  1. Navigate to the change order tab of your active construction pay document, right-click the existing CO-147 row, and insert a new blank row directly below it.
  2. Copy over the project ID, request date, and foreman approval fields from the original CO-147 row to the new blank row, then update the change order number field to CO-147A.
  3. Enter the scope of work, labor costs, material costs, and markup values for the storage closet framing work in the corresponding columns of the new CO-147A row.
  4. Add a new column to the right of the change order number field labeled “Duplicate ID Flag”, enter a value of 1 in both the CO-147 and CO-147A rows, and add a comment to each flag noting that the two entries originally shared the CO-147 number before the adjustment.
  5. Save a version of the updated pay document with a file name that includes the date and the note “CO-147 duplicate resolved” so you can easily reference the adjusted version later if needed.

You run a quick sum of all change order entries after you save the updated file, confirming that the total matches the sum of all physical change order slips you have on hand for the current billing period, so you don’t underreport eligible costs when you submit the draw. You also email a copy of the updated pay document to the field superintendent, attaching photos of both signed change order slips, so they have a record of the adjustment and can reference the new CO-147A number if they submit any related paperwork for the rest of the project.

Pull this same pay document when you finalize next month’s scheduled draw request

When you come back to this file in 30 days to wrap up the next billing cycle, you’ll first check the Duplicate ID Flag column to confirm that both CO-147 and CO-147A are marked as processed if they are included in this month’s draw, or carry them over as eligible if you opted to hold them for the next cycle to align with completed work milestones. You’ll also cross-reference the two entries against the foreman’s weekly work completion reports to make sure all scope listed on both slips is fully signed off before you include the associated costs in any submitted draw package. You’ll cross-check the adjusted change order numbers against the accounts payable ledger to ensure any payments applied to the work are mapped to the correct entries, so you don’t end up with unassigned costs in your project tracking at the end of the quarter. You can ignore the duplicate number flag once both entries are marked as processed, but you should leave the flag in place for the full duration of the project so anyone auditing the pay documents down the line can trace the numbering error and adjustment without having to track down the physical slips. If you find additional duplicate number entries as you process future change orders, you can use the same flagging system to resolve them quickly, without having to restructure your entire log or correct previously submitted draw paperwork. You’ll also be able to reference this adjustment to refine your change order numbering process going forward, adding a step to cross-check new slip numbers against the existing log before you sign off on approval to avoid this same error in future billing cycles.