One Trade Row on the Schedule of Values

Educational overview only. Prudent Guardian (www.inspirecodingedu.com) is not an insurance company, broker, law firm, or registered investment adviser, and does not provide personalized insurance, investment, tax, medical, or legal advice. Verify details with licensed professionals and official issuers.

The sheet has many rows. You are on a single trade. Your pen hovers over the entry for rough electrical work, the line item you submitted three weeks ago as part of your preliminary billing package. A smudge of drywall dust blots the far-right column where you noted change order add-ons last week, and you tap the edge of the paper once to brush loose debris off the surface.

Cross-reference checks for this line item

You start by matching the line item number printed to the left of the trade name to the corresponding number on your original signed bid, to confirm you are reviewing the correct scope of work. You cross the total allocated value for this row against the contract addendum you signed after final scope negotiations last month, to make sure no last-minute changes were omitted from the master schedule the general contractor distributed. Illustrative example: If your rough electrical trade row is allocated $124,700 of the total project budget, and you have completed 65% of the scope to date, your current draw request for this line would be $81,055 before standard 10% holdback deductions. You also cross-reference the pre-filled completion percentage against your foreman’s daily log entries from the last two pay periods, to confirm the number listed aligns with work that has passed preliminary inspection and is eligible for billing. You ignore the other rows for plumbing, framing, and drywall for now, as those fall under separate subcontractor scopes and do not impact your billing for this pay period.

One Trade Row on the Schedule of Values
The packet is tied. No labels show.

Adjustments you can make to this entry today

You can update the listed completion percentage if your foreman’s latest text update notes that final rough-in inspections for the core building passed yesterday, which adds 8% to your total completed work for this scope. You can add a short note in the open comments column for the recently approved change order that covers wiring for the new loading dock security system, so the project manager doesn’t flag the minor value shift as an unapproved overbilling attempt. You can cross out the old 10% holdback percentage written in the far-right column if the contract terms adjusted after the first pay app, writing the new 5% rate in red ink so it stands out during the accounting team’s review. You don’t need to rewrite the entire row for these small edits, as long as you initial any changes in the narrow margin directly next to the line item number to confirm you approved the adjustment. You avoid crossing out any pre-filled line item numbers or trade names, as those are locked to the master contract and cannot be adjusted without a formal change order submitted to the general contractor’s operations team.

Breakdown of included work for this trade row

This single line item rolls up four distinct categories of work you included in your original bid, each with its own allocated value and completion timeline. The table below maps each category to its assigned budget and current progress, so you can quickly reference which portions of the work are eligible for billing in your current draw:

Work Category Allocated Value Percent Complete to Date
Underground feeder wiring to main electrical panel $32,200 100%
Rough-in wiring for all core building interior suites $64,100 60%
Temporary power for site staging and heavy equipment $18,400 100%
Approved change order: loading dock security system wiring $10,000 25%

Each of these categories maps to individual line entries in your original bid submission, so you can pull the corresponding supporting paperwork, including material receipts and inspection sign-offs, if the project coordinator asks for backup during the draw review process. None of these categories include work for the low-voltage communications system, which is listed as a separate trade row on the schedule of values to avoid scope overlap with the communications subcontractor assigned to that portion of the project. You can add a small note at the bottom of the row noting that the temporary power scope will remain on this line until project closeout, when you remove the temporary poles and panels from the site.

Common discrepancies you can flag right now

As you review the row, you can catch and correct small inconsistencies before you submit your pay app, cutting down on delays in review and processing. First, if the allocated value listed for this trade row is $121,700 instead of the $124,700 you agreed to in the signed contract, you can note that mismatch immediately so the accounting team can update the master schedule before you finalize your submission. Second, if the completion percentage pre-filled by the general contractor’s admin team is 40% instead of the 65% you have documented with inspection sign-offs, you can cross out the incorrect number and add a short note pointing to the dated inspection sheet stored in your project folder. Third, if there is a holdback amount listed that applies to 100% of the line item value instead of only the portion of work that is complete, you can highlight that entry to adjust before you calculate your total draw amount. Fourth, if the line item description lists only “commercial electrical work” instead of the specific “rough-in electrical, core building only” scope you agreed to, you can edit the description to match the exact contract language to avoid future confusion about what work falls under this row. You can upload copies of the inspection sign-offs and contract addendum to attach to your draw submission directly through Draw Jacket to cut down on back-and-forth requests for supporting documentation from the general contractor’s team.

Next time you pull this schedule of values page

The next time you open this exact page will be two weeks from now, when you prepare your next pay app after the full rough-in inspection sign-off is finalized and your team has moved on to pulling wire for the first-floor tenant suite buildouts. You will cross reference the completion percentage you wrote on this current entry against the new work completed in the intervening period, updating the number to reflect any progress that passes formal inspection by the city’s code department. You will scan the comments section of this row for any notes left by the project manager during their review of your current pay app, to address any questions they have about the change order addition or adjusted holdback rate before you submit your next request. You will also cross the updated total billed amount for this line item against the remaining budget allocated for electrical work, to make sure you are on track to bill for the full contract value by the time your scope of work is 100% complete. You won’t need to rewrite the entire breakdown of work categories at that point, as the table you reference today will still map to the original contract scope, with any new change orders added as separate line items below this one if they are approved in the coming weeks. You will also bring your foreman’s latest daily logs with you when you review the page at that time, to confirm all completed work is documented correctly before you submit your next draw.